igus' energy chain is always delivered in less than 10 days and ready to install
The Engineering Network Ltd
Posted to News on 27th Feb 2014, 00:00

igus' energy chain is always delivered in less than 10 days and ready to install

readychain, from plastics expert, igus, is a comprehensive energy chain solution designed to help machinery and plants - from an access platform to a crane - reduce down times and thus costs.

igus' energy chain is always delivered in less than 10 days and ready to install

>readychains from igus are the complete energy supply ready to install and comprise energy chains completely assembled with cables, hoses and connectors as well as custom metal work and fittings. Transport racks, installation and maintenance support are also available on request.

>Delivered to the customer in around 10 days, readychain is specifically designed and manufactured to meet the needs of igus' customers. With no storage of cables, connectors and associated extra parts needed, storage costs are reduced to zero.

>In order to ensure speed, every readychain system is carefully tested by igus before delivery and certified according to ISO 9001.

igus (UK) Ltd

51A Caswell Road
Brackmills
NN4 7PW
UNITED KINGDOM

+44 (0)1604 677240

The Engineering Network Ltd ABSSAC Ltd Phoenix Mecano Ltd Phoenix Contact UK AdaptTech Manufacturing Solutions Leuze electronic Ltd Pepperl+Fuchs GB Ltd ETA Enclosures (UK) Ltd IDE Electric S.L Baumer Ltd BR Consultants UK Lenze Ltd Motor Technology Ltd WISKA UK RLS Merilna tehnika d.o.o.
The Engineering Network Ltd