Fully EMC-shielded and highly robust outdoor housings can now be rear-mounted

The metal housings in the Han EMV and Han HPR series are now available in versions that enable contact inserts to be mounted from the rear, an option that simplifies the placement of interfaces on switch cabinet walls, increases the installation speed and lowers costs in the long term.

Harting has produced other connector types that feature a rear-fit mounting option. Over the past two years, the Han-Eco A and B and the Han B and Han M series came out with this ‘rear-fit’ installation option. Now, the option is available for the first time for the Han EMV and Han HPR series.

Rear-fit mounting means that contact inserts can be installed in the housing from the rear, which is particularly important for installation in cabinets in combination with prefabricated cable assemblies. Assembling both products is further accelerated by using a mounting frame. Alternatively, the modules can be inserted directly into the housing. All Han series that feature the Rear-Fit option make it easier to install contact inserts and cut installation times.

The ‘Rear-Fit’ housings are also interoperable with earlier versions that cannot be equipped from the rear, which translates into a cost-effective, step-by-step introduction of the new housings into production.

Harting

Caswell Road
Brackmills Ind Est
Northampton
NN4 7PW
UNITED KINGDOM

01604 827500

gb@harting.com

www.harting.co.uk

More products
What changes does the new machinery regulation bring?
As the machinery regulation replaces machinery directive 2006/42/EC, Dirk Meyer, specialist engineer solution architect at Eaton, looks at what is changing.
Klüber Lubrication receives Schaeffler Supplier Award 2022
Schaeffler has awarded Klüber Lubrication with the Supplier Award 2022 in the field of quality. The jury emphasised in particular the global supplier's strong commitment to the compliance with quality standards.
Essentra Components cuts energy usage by 15% globally
An innovative energy reduction initiative based on the concept of insulated jackets is helping industrial components manufacturer Essentra Components cut its energy usage when heating machine barrels by 15% and save CO2 emissions in the process.
Fluke addresses requirements to improve operational efficiencies
Rising energy costs and more stringent legislation guiding sustainable practices is spurring companies to re-evaluate processes and seek new tools and technologies to reduce waste and overcome challenges in today’s industrial environments.
7th axis robot in a welding application
An Igus 7th axis on a collaborative robot working alongside staff at German screening machine manufacturer Rhewum is helping to increase the workspace from 1300 to 5500mm.
Robust inductives position automotive workplace carriers on conveyor
An automotive manufacturer is relying extensively on the reliability of Contrinex’s robust and high-performance inductive sensors in the automated assembly of engines, where cylinder heads are transferred for mounting on the engine.
New Leuze plant in Malaysia begins operation
After a construction time of just 16 months, Leuze has opened its new production site in Malaysia. With immediate effect, Leuze sensors will be produced there for the international market.
Multiple Delta UPSs key to prestigious project in the Baltics
Greenergy Data Centers has recently built a new, large-scale data centre in Tallinn, Estonia, making use of multiple uninterruptible power supplies (UPS) from Delta, installed and commissioned by Delta’s partner, DC Solutions.
Nord brings industry solutions to Drinktec trade fair
From 12 to 16 September 2022, the beverage and liquid food industry meets at the world leading drinktec trade fair in Munich. Nord Drivesystems will be presenting its solutions for the industry, which focus on energy efficiency and hygiene.
Teledyne Flir gives Çanakkale Bridge travellers a safer crossing
Teledyne Flir has installed its dual thermal AID camera technology for use on the new 1915 Çanakkale Bridge in Turkey, which was constructed in a joint venture between DL E&C (formerly Daelim), Limak, SK Ecoplant and Yapı Merkezi.

Login / Sign up