Share
Industrial Technology - Linked-in Industrial Technology - Twitter Industrial Technology - News Feed
Latest Issue
Diary and Events

Southern Manufacturing

Farnborough, Hants(GU14 6TQ)

20/04/2021 - 22/04/2021

Southern Manufacturing and Electronics is the most comprehensive annual industrial exhibition in the (more)

PPMA Show 2021

NEC, Birmingham(B40 1NT)

28/09/2021 - 30/09/2021

PPMA Show 2021 will be the UK’s largest ever event dedicated to state-of-the-art processing and (more)

Advanced Engineering 2021

NEC Birmingham(B40 1NT)

03/11/2021 - 04/11/2021

Join us in our 12th and most important edition to date, as we invite engineers and management from all (more)

Keeping London Underground on the rails

Keeping London Underground on the rails Pfaff-silberblau has been selected by Metronet Rail to supply 34 of its type HD 10 tonne swl screw jacks to the London Underground maintenance depot at Northumberland Park. This follows on from an order for eight similar screw jacks at London Underground's West Ruislip depot last year. Metronet Rail is responsible for maintaining, replacing and upgrading all infrastructure on nine of the twelve London Underground Tube lines which includes work to 347 trains, over 471 miles of track and 1,263 points and crossings. The new Pfaff systems are to be installed as an integral element of Metronet Rail's ongoing preventative maintenance programme. Each system comprises eight screw jacks synchronised by a central control panel. The screw jack systems lift complete train car bodies to facilitate the changing of bogies which incorporate the drive motors. Their use significantly speeds up the process of replacing the bogies ensuring that rolling stock can be returned to service in the minimum time. Many safety features are incorporated into the screw jacks, including wear monitoring nuts which also act as fail safe devices in the unlikely event of failure of the main load bearing nuts. Pfaff-silberblau screw jacks are also installed in London Underground depots at Hainault and Waterloo. With the addition of Northumberland Park, the total number of Pfaff-silberblau screw jacks installed at London Underground depots will exceed 100. This latest order includes installation and commissioning of the screw jack systems by members of Pfaff-silberblau's team of engineers who already undertake maintenance of the London Underground screw jacks.
 

Other News from Pfaff-Silberbau

Latest news about Machine Building

Additional Information
Text styles