Share
Industrial Technology - Linked-in Industrial Technology - Twitter Industrial Technology - News Feed
Latest Issue
Diary and Events

Industry 4.0 Summit

Manchester Central Convention Complex(M2 3GX)

31/03/2020 - 01/04/2020

The UK’s leading conference gathering of senior level executives from the UK manufacturing industry (more)

Drives & Controls Exhibition

NEC, Birmingham(B40 1NT)

21/04/2020 - 23/04/2020

The show brings together key suppliers of state-of-the-art equipment representing the multi-tasking culture (more)

UKIVA Machine Vision Conference 2020

Marshall Arena, Milton Keynes(MK1 1ST)

14/05/2020

Vision solutions have been applied in almost any industry you can think of. Food, beverage, pharmaceutical, (more)

PPMA Show 2020

NEC, Birmingham(B40 1NT)

29/09/2020 - 01/10/2020

PPMA Show 2020 is the UK’s largest ever event dedicated to state-of-the-art processing and packaging (more)

Advanced Engineering 2020

NEC, Birmingham(B40 1NT)

04/11/2020 - 05/11/2020

The UK's largest annual advanced manufacturing trade show, Advanced Engineering is your opportunity to (more)

New report says too much maintenance in UK industry remains ‘reactive’

New report says too much maintenance in UK industry remains ‘reactive’

A third of manufacturers consider their maintenance programmes to be reactive rather than planned or predicted, according to a recent study. The report, published by Bosch Rexroth and the Institute of Engineering and Technology, surveyed nearly 300 engineers in UK industry and found that maintenance practices continue to be a cause for concern.

32 per cent of those who took part in the survey described their maintenance as being reactive with less than 30 per cent implementing either predictive or preventive maintenance regimes. “The fact that nearly 30 per cent of manufacturers in our recent poll would class their maintenance strategy as predictive or preventive is something to be celebrated,” says Richard Chamberlain, UK Service Manager at Bosch Rexroth. 

He continued: “However, there is still some way to go both to help bridge the gap for those that continue to take a reactive approach and helping forward looking manufacturers take that extra step towards a more planned maintenance programme.”

One of the key barriers to adopting a more forward thinking approach by maintenance teams is resource, according to the report. 53 per cent of respondents answered that maintenance budgets have stagnated or decreased in recent years, and 64 per cent responded that maintenance personnel numbers have similarly stayed the same or reduced.

“Maintenance resource is the major issue for manufacturers,” says Mr Chamberlain. “All-too-often, maintenance teams are stretched too thinly to be able to be more planned and predictive, instead resorting to firefighting to keep machines running.”

What you don’t repair you destroy – A report into maintenance practices in UK Industry by Bosch Rexroth can be downloaded from https://bit.ly/RexrothMaintenance.

More information

Other News from Bosch Rexroth Ltd

Improve the ROI on your drives installation

Latest news about Machine Building

Additional Information
Text styles